The Rebuild Starts!





 Hello dear friends, after some delays during the demolition of our old stone house I am so excited to share some of the the progress that is being made!




While the renovations are ongoing we were temporarily blocked from the second floor addition including our bedroom and bathroom.  We have converted our dining room into a bed/sitting room and Vera is in her element.  She spends most of the day lounging on the bed with her collection of stuffies, looking out the window, barking at squirrels, chipmunks and anyone on the road in between taking  lengthy naps.





The old timbers that were part of the main floor structure have all been removed and are piled up outside.  These timbers were all part of the original construction so are approximately 170 years old.  We don't want to get rid of them as they are original to the old house so they have some sentimental value.  How many people can claim to have 170 year old timbers?  We are thinking of using them to build a folly at Lake Ophelia.




The new engineered rim joists were fastened to the stone wall using special anchor screws.  The gap between the rim joists and stone wall was filled in with mortar to further strengthen the construction.  The use of these engineered rim joists and floor joists was not part of our original plan.  The demolition however did reveal some issues with the old timbers and joists and these new joists will be much faster for the carpenters to work with.  


Once the rim joists were in place the floor joists were attached using joist hangers.  Then the process of laying the subfloor started.  At this point the house looks much larger than it really is!  The main floor and second floor are approximately 1200 square feet.  




A temporary railing for safety was constructed around the opening to the basement.  


Of course a glass of wine to celebrate the progress was in order!


And for fun we invited BearBear 1 and BearBear 2 to join us.  We left the evidence for the carpenters to find the following morning.


Now, back to the serious business of the renovations.  Once the subfloor was installed the interior framing could begin.  First vapour barrier was installed over the stonework and then the studs were installed.   Rock wool insulation batts will be placed between each of the studs.   This will greatly increase our comfort in the winter by keeping the house much warmer.  Our furnace will be happy as well at not having to work so hard.




A temporary staircase was added last week which allows the carpenters to start working on the second floor and also gives us access the second floor of the addition.  I am so happy to be able to access our bedroom again.  This renovation has been very disruptive to our normal routine and I am so pleased to be able to sleep in my own bed again!



The old cedar joists that supported the second floor have all been removed and are being replaced with the same engineered joists that are being used for the main floor.



This week the carpenters have laid the subfloor for the second floor and are working on building the studs for the walls.  It is exciting to imagine what these areas will look like once completed.  The little alcove by the cathedral window is going to become a reading nook.



This area was previously two bedrooms.  We have decided to sacrifice the smallest bedroom and combine the two rooms into one large bedroom.




This area was previously a bedroom and second floor bathroom and wont change significantly.



That is the update for now!  Thank you for following along on our big renovation adventure.  I will have more to share in a couple of weeks.



Thursday, September 11, 2025

Demolition Time Part 2




Hello dear friends, after a little break I am back with an update on our renovations!

The main floor of our house was built on rough hewn timbers.  Many of the timbers still have bark after all of these years!  When we first bought our house we thought this was fascinating.  Although the timbers were still quite solid after much discussion with the contractor it was decided that we should remove the old timbers and replace them with engineered floor joists.  Although we felt a little nostalgic about these old timbers (not really!) replacing them would make it much easier to level the main floor and provide a very solid base for the new flooring.


Let's start with the basement of our old house.  There is a low basement under our living room (the south side of our stone house) but just a literal crawl space under the library and old kitchen on the north side.  When we moved in we thought that the basement  on the south side had a dirt floor but were surprised to find that it was actually a poured concrete floor that was covered in decades' worth of decayed wooden pallets.  Because the house is rubblestone construction the basement was often wet and and we believe that previous owners would lay down wooden pallets to walk on.  



The clearance between the old timbers and the dirt foundation on the north side of the house was only about 12 inches.  We often wondered how someone was able to run ductwork into such a small area and would joke that some poor apprentice was tasked with the job.  One of the factors we considered in having the stone house gutted was the discovery that the heating ductwork under this part of the house was corroded.  When I was working from home during covid I complained endlessly about how cold the library was and now we know why.  The contractor said we were heating a lot of dirt for the mice.  :(



The basement on the south side of the house had about 6 feet of clearance.  When we bought the house it had an ancient oil fired furnace that often failed.  We had a new furnace installed with the heating company working with the ductwork that was already in place.   When our furnace stopped working two years ago the repairmen could barely stand in this place.   (Although we refer to this as the basement we can only use it as a mechanical room for the furnace, hot water tank, water pressure tank and freezers.  It is too damp to use for storage.)  As the floorboards were being removed for the renovation we could see what a maze of ductwork had been installed when heating was first installed in the house, probably from the 1950s.  The heating contractor now has a wide open space to work with so the new ductwork will be laid out in a more efficient manner.  



As the walls were being gutted we had a chance to learn more about the construction of the house.  Many posts still had bark on them.  


The joists and timbers all have old hand made iron nails.








The joists that supported the second floor were old growth cedar.   Many of the joists had been spliced together.  Some had sections shaved off of them which is a mystery.  The photo above shows the joists that supported the smallest bedroom upstairs which had the most wobbly floor.  Why someone cut aways slices from the top of the joists is a mystery!



The demolition of the interior of the house took about 15 days with a crew of 3 people.  They used chainsaws to cut the timbers into manageable chunks for removal.





The house looks so different with the floors and walls removed.


This north section of the house needed to have dirt removed to allow for about 18 inches of clearance under the new floor.   The workers used shovels and buckets to move the dirt onto a conveyor so it could be loaded onto a utility trailer outside.  This area will have insulation installed under the flooring along with new ductwork for the furnace and a new air conditioning unit.  This will make a significant difference in heating in the winter.




This is a view of the south side of the house completely gutted.  The windows are going to be replaced and we are going to have a new stone fireplace constructed to replace the red brick that I have always disliked.


A view towards the north side of the house.



The water lines and propane lines are still in place as is the furnace.  The workers are happily calling out suggestions to us for possible uses of this space.  Make it a sound studio!!  This should be a party venue!  This would be a great workshop!! Let's put in a dance floor!


The wine rack survived the demolition!  The bottles of wine were moved to a safer location.


There are two chest freezers remaining in the old basement and a source of power remains to keep them running.

And now the contractor has a clean slate ready to start building!